WTC Construction Update, September 2010

1 WTC:

  • Tower steel is now above the 36th floor

Memorial and Museum

  • Installation of several oversized artifacts, including two "tridents" from the original Twin Towers, are being installed at the site
  • First 16 Trees planted in August

Tower 4:

  • Below grade hoist erected below street level for work on the mechanical and utility systems
  • Concrete pour up to the 4th floor
  • Core steel erection has risen to the 7th floor

Tower 3:

  • Drilling, demolition and excavation

Tower 2:

  • Drilling, demolition and excavation