WTC Construction Update, October 2010

Memorial and Museum

  • More than 40,000 cubic yards of concrete poured
  • Steel erection is 99% completed

4 World Trade Center

  • Concrete poured to the 4th floor
  • Framed deck up to the 6th floor
  • Installed steel up to the 7th floor

 3 World Trade Center

  • 200 cubic yards of concrete to be poured in footings this month

 2 World Trade Center

  • 1540 cubic yards of concrete to be poured in footings this month

 1 World Trade Center

  • Installed steel to the 38th floor